256.533.7730 • info@jessestuttsinc.com
3414 9th Ave., SW • Huntsville, AL 35805
Project size:
Use: An 8 Megawatt substation with four 2 Megawatt Cummins Generators that have the capabilities to supply emergency power if needed, this substation supplies the main electrical power to the Army Military Command center.
Contract Amount: $12 Million
Scheduled Completion: July 2010
Project size: 16,082 sq. ft.
Use: Band facilities
Contract Amount: $550,000
Description: Design / build project consisting of a new 16,082 square foot building on Redstone Arsenal, near the new U.S. Army Materiel Command headquarters building. The band facilities will include space for a large rehearsal room, individual practice rooms, library, instrument storage, repair and cleaning, changing rooms and administration space
Project size: 136,000 sq. ft.
Use: Hangar and Maintenance facility
Contract Amount: $7,549,000
Description: Design / build project consisting of a 136,000 square foot Hangar and Maintenance facility for the Rotary and Fixed Wing Aircraft with associated hardstand, apron and taxiway. A separate 27,000 square foot headquarters facility consisting of Administration space and computer support areas.
Project size:
Use: Office Building
Contract Amount: $2.4 million
Duration: 1.6 years
Special Features: description
Project size:133,000 sq. ft.
Use: Office Building
Contract Amount: $3.3 million
Duration: 1.8 years
Special Features: Solar power parking lot lights, Auto dimming / Light harvesting this building meets silver level requirements for Leeds building standards.
Project size:108,000 square feet
Use: A state-of the-art laboratory for cutting-edge research into advanced research systems that could enable more ambitious exploration of the Solar System. The 108,000-square-foot facility has 26 labs and several support areas for large- and small-scale experiments. 66,000 square feet of usable space for large-scale and small-scale advanced propulsion research experiments. Individual labs ranging in size from 360 square feet to 10,000 square feet. The facility’s 12-foot-wide corridors and oversized doors allow large equipment to be easily moved from one room to another. High-bay areas reaching as high as 55 feet and equipped with 5 to 15-ton bridge cranes also provide the necessary space for large experiments. A separate 7.5 to 10 megawatt electrical substation allows the laboratory to conduct high-power experiments without disrupting service to other parts of the Marshall Center.
Contract Amount: $2,244,681.00
Duration: 1.9 years
Special Features: Multiple underground primary electrical services, interior power distribution, interior and exterior lighting, fire alarm installation and emergency power.
Project size:205,000 square feet
Use: Five-story educational, laboratory and research center
Contract Amount: $5.2 million
Duration: 1.7 years
Special Features: 4000A incoming service, 500kW generator, Over 100 480v and 120v power panels, Programmable lighting controls Installed Voice and data and Audio and Video systems
The new 200,000-square-foot, $60 million Shelby Center for Science and Technology is a "jewel" that will help not only UAH but all of Alabama grow, according to U.S. Sen. Richard Shelby.